Proper Lubrication of Moving Parts

Check all moving parts for proper lubrication. Proper lubrication is absolutely essential for the quality operation and longevity of the moving parts on the AMAYA.  Scheduled lubrication as specified in this manual is the minimum lubrication schedules that must be followed to maintain the AMAYA in optimum operating shape.

At a minimum, the rotary hook should be lubricated after each operation.

Other parts should be lubricated on schedule as specified in this manual.  Failure to maintain proper lubrication of the AMAYA will result in premature failure of moving parts, especially with regards to the rotary hook.

IMPORTANT: Make sure that the felt pads at the top and bottom of the needle case 4-packs are soaked with oil to ensure proper lubrication of the needle bars.